Civil society organisations have referred to as on Minerals and Energy Minister, Gwede Mantashe, to reduce the severity of load shedding by opening South Africa’s renewable energy floodgates.
They have given him 10 days to reply to their calls for.
The organisations are calling for wind and photo voltaic energy programs to be constructed and related to the nation’s electrical energy grid.
“The most urgent thing is to get wind and photovoltaic (PV) energy onto the system as fast as possible,” mentioned Hilton Trollip, a analysis fellow on the University of Cape Town’s (UCT) Global Risk Governance Programme.
Integrated useful resource plan
The organisations criticised Mantashe for not unlocking the nation’s renewable energy, as acknowledged in authorities’s built-in useful resource plan (IRP) in 2019.
“South Africa’s electricity supply is in dire straits… We call on Minister Mantashe to unlock the 13GW of renewable energy and battery storage as approved by Cabinet in the 2019 IRP,” mentioned the South African Climate Action Network’s Thando Lukuko.
ALSO READ: Europe to give SA billions to help free nation from coal and Eskom
Trollip steered there’s an unwillingness from authorities to get this further energy on South Africa’s electrical energy system.
“Right now it’s stuck, but there needs to be a will to get this energy on the grid,” he mentioned.
Solar and wind energy
The teams have additionally referred to as for Mantashe to pressure Eskom to construct photo voltaic and wind energy programs.
They additionally need Eskom to lower tariffs and make it less complicated for residents and companies to set up photo voltaic programs and add the energy to the grid.
“It won’t get rid of loadshedding but [these measures] would mean it’s less severe, with maybe level 2 being the worst load shedding we experience, and it would occur less often,” mentioned Peter Becker, spokesperson of the Koeberg Alert Alliance.
“Renewable energy and storage have been shown to be far quicker to build than other forms of generation. If Minister Mantashe acts with urgency and carries the best interest of South Africans at heart, he should do everything in his power to add more electricity to the grid as quickly as possible.”
ALSO READ: SA can’t depend on single state utility any longer, says Eskom board member amid load shedding
Mantashe has beforehand acknowledged that his reluctance in direction of shifting away from coal fired energy crops and introduce renewable energy is as a result of he believes it is going to lead to costlier electrical energy and a lack of jobs.
Independent energy analyst – Clyde Mallinson, nonetheless, pored chilly water on the minister’s considerations.
“At the moment we are shedding jobs due to the lack of electricity. Jobs can be created by [renewable energy] installation but [even more] jobs are created by more available and more affordable electricity going forward,” he mentioned.
The organisations that signed the open letter to Mantashe are:
- 350Africa.org
- African Climate Alliance (ACA)
- Alternative Information and Development Centre (AIDC)
- Centre for Child Law
- Centre for Environmental Rights (CER)
- Extinction Rebellion Cape Town
- Extinction Rebellion Nelson Mandela Bay
- Federation for a Sustainable Environment
- Fossil Free South Africa
- The Green Connection
- Koeberg Alert Alliance (KAA)
- Organisation for Undoing Tax Abuse (OUTA)
- Project 90 by 2030
- Section27
- South Africa Climate Action Network (SACAN)
- Southern African Faith Communities Environment Institute (SAFCEI)
The teams mentioned if Mantashe doesn’t reply by 17 July 2022, they are going to urge President Cyril Ramaphosa to instruct him to accomplish that, “as was necessary to lift the limit for companies to produce their own electricity without a licence from 1MW to 100MW”.
Emergency technique for renewable energy
The name from the civil society teams comes after authorities’s National Planning Commission (NPC) on Wednesday referred to as for an emergency plan to finish load shedding in two years.
It mentioned this might be achieved by introducing 10,000MW of wind and solar energy and 5,000MW of battery storage.
It additionally needs regulatory obstacles to be eliminated.